Facilities & programmes

funds tied to recorded reality synthetic demo data

Facilities

evidence-linked lending across the book
FacilityStageEvidence state

Plan-to-activity chronology · Wychwood soil-transition

1 named gap gates drawdown 2
stated plan min-till kit · Feb drawdown 1 · released drill purchased · 4 Mar evidence invoice + machinery log drawdown 2 · gated establishment log missing outcome SOM · not yet measurable nothing is disbursed against an incomplete chain — the gap is named and visible to both sides outcomes are evidence for review — never a lending verdict
Request the missing log Open funded-activity record

Snapshot timeline · what was known when

audit defensibility for every decision point
SnapshotDateRecordsSince then
Application12 Jan 202661+9 records · 1 addendum (flagged, not silent)
Drawdown 118 Feb 202666+4 records
Drawdown 2pending — gated701 named gap
Annual reviewscheduled Novwill freeze at review
Open snapshots & diffs Example addendum flag

Sustainability-linked lending · Blackthorn green facility

real MRV, never a green score
Funded activity
min-till transition · 240 ha · actual operations recorded (PRF-UK-C-000355 pattern)
CO2e/ha · fuel boundary
0.41 vs baseline 0.58 · n=9 fields · fuel records · 2025–26 · opens to machinery logs
Soil organic matter
4.1% · LOI held constant since 2021 · next measure Aug 2026 (PRF-UK-A-000198)
Margin ratchet basis
the facility's SLL terms reference these measures directly — verified against funded activity, not a composite score
Open environmental measures
Facility rules: released funds tie to recorded actual activity; snapshots prove what was known at each decision point; gates are visible to both sides; outcomes inform review but never become a credit verdict or green score.